How to Read Slope Stakes

Jupiterimages/Comstock/Getty Images

A slope stake directs an operator to raise or drop the grade of the ground over a run at a particular slope by providing on-site specifications. Slope stakes are lathes that are staked into the ground and are marked with a series of letters and numbers. Each letter and number on a stake has a defined meaning; the numbers provide measurements and slope ratios. Each series of letters and numbers is separated by a straight line. The two actions an excavator performs are cut and fill; a slope stake indicates which to perform, where to start and end the cut or fill from the slope stake and at what slope.

Step 1

Read the slope stake from the top down. The top numbers provide the offset distance -- the the horizontal measurement from the slope stake to the catch point. The catch point, or intercept poin, is the location from which the operator begins filling or cutting. For example, a "10" directs the operator to begin excavation 10 feet from the bottom of the slope stake. The measurement is always from the marked face of the lathe, never the side or the back.

Step 2

Read the series of letters and digits under the first horizontal line. This series indicates total excavation. "C" indicates a cut and "F" a fill. The numbers indicate the vertical length of the cut or fill from the intercept point to natural ground. A lathe marked "NG" indicates natural ground. For example, if the series is marked "F-9.5." the vertical fill required is 9 feet, 6 inches.

  • Read the slope stake from the top down.
  • The numbers indicate the vertical length of the cut or fill from the intercept point to natural ground.

Step 3

Acquire the horizontal distance of the slope from the third series of numbers on the lathe. This number determines the distance from the intercept point to the natural ground point on a horizontal line.

Step 4

Acquire the rate of slope. The fourth set of numbers is a ratio; 2:1, for example, means 2 feet of run per foot of rise or fall. For every foot of horizontal run, the slope requires 1/2-foot of cut or fill.

Step 5

Determine offset difference from the fifth series of numbers. The offset difference is the position of the bottom of the stake in relation to the intercept point. If the number is negative, the intercept point is above the slope stake; if it is positive, the slope stake is above the intercept point.

  • Acquire the horizontal distance of the slope from the third series of numbers on the lathe.
  • The offset difference is the position of the bottom of the stake in relation to the intercept point.

Related Articles

How to Make a Plot Plan of Your House
How to Make a Plot Plan of Your House
How to Build Steps on an Uneven Surface
How to Build Steps on an Uneven Surface
How to Draw an Elevation in a Landscape Designs
How to Draw an Elevation in a Landscape Designs
How to Build Carport Footing
How to Build Carport Footing
How to Spread Road Base
How to Spread Road Base
How to Make Steps in a Garden Slope
How to Make Steps in a Garden Slope
How to Stabilize a Pergola
How to Stabilize a Pergola
How to Measure for a Chain Link Gate
How to Measure for a Chain Link Gate
How to Use Concrete Blocks for Cattle Guards
How to Use Concrete Blocks for Cattle Guards
How to Anchor a Garden Arch
How to Anchor a Garden Arch
How to Build a Breeze-Block Wall
How to Build a Breeze-Block Wall
Proper Drainage for Sloping Driveways
Proper Drainage for Sloping Driveways
How to Use Felling Wedges
How to Use Felling Wedges
How to Put in Drainage for an Asphalt Driveway
How to Put in Drainage for an Asphalt Driveway
How to Dig a Hole for a Pool
How to Dig a Hole for a Pool
Garden Guides
×